Nineteen things a resin flooring bid should put in writing. Mark each bid against the same list, see what is missing, and print the result.

First published November 27, 2026

Flooring bids are hard to compare because each one leaves out different things. A low price can be a bid that is silent on prep, moisture testing or off-hours work. This worksheet lines up to three bids against the same questions. Each question links to the page that explains it. The worksheet runs in your browser. It does not send what you mark anywhere and does not save it, so print it when you are done.

Does the bid put this in writing?Bid ABid BBid C
The resin system and the manufacturer's product names (why)
Floor thickness and build: coating, broadcast or troweled (why)
Prep method, and the surface profile (CSP) the data sheet calls for (why)
Which moisture test, at how many spots, and the pass limit (why)
What happens to price and schedule if the moisture test fails (why)
How cracks, joints and drains are treated, and that it is in the price (why)
Cove base as its own line, by the linear foot (why)
Work hours, and whether night or weekend work is in the price (why)
An odor and ventilation plan: containment, where the exhaust goes, which HVAC zones are sealed (why)
When food and stock must be out, and when they can come back (why)
Hour-by-hour return to service: foot traffic, carts, forklifts (why)
The lowest slab and room temperature the system can be installed at (why)
The texture of the finished surface, with a sample to look at (why)
Data sheets and safety data sheets for every product (why)
Warranty terms: who backs it, for how long, and what is left out (why)
The license or registration that covers the work, and where to look it up (why)
A certificate of insurance sent by the insurance agent (why)
References for floors like yours that have been in service a while (why)
Cleaning instructions for the finished floor (why)

Mark each line Yes, No or Not stated to see what to go back and ask.

How to use it

  1. Read each bid with this page open. Mark Yes only when the bid says it in writing. A promise on the phone is "Not stated".
  2. Send each bidder the list of what their bid left out, and ask for a revised bid. A contractor who wants the job will answer.
  3. Compare prices only after the gaps are filled. Until then the bids describe different jobs.

Reading the result

A line marked No is not always a problem. A cooler floor does not need a food-return plan if the cooler is empty, and a room outside a food business may not need cove base. What matters is that every bid answers the same questions, so nothing is left to be argued about after the work starts.

More lines marked Yes does not make a bid the best one. It makes it the clearest one. The worksheet is not a quote and does not rate any installer. The cost guide covers why prices differ, and the downtime calculator adds the cost of closed hours to each price.

This list applies to every installer. That includes this one. Ask Twin Cities MMA Flooring the same questions you ask anyone else.