Twin Cities MMA Flooring(763) 357-8645

HomeGuides

Guides

Plain answers to the questions that come up before, during and after a resin floor job. Each guide names its sources and shows the date it was last checked.

These pages are written for the person who signs the purchase order: a plant manager, a kitchen owner, a building engineer. They explain what a bid should say and what to ask, so you can judge any installer's answers, including this one's. None of them carries a price. The cost guide explains why.

Choosing a floor

Before the install

After the install

Reference

  • Glossary: the words on a flooring bid, in plain English.
  • FAQ: short answers, with links to the guides behind them.

How the guides are put together

Each guide summarizes documents that anyone can read: manufacturers' data sheets, published standards, government rules and trade magazines. Almost every figure comes with the name of its source in the same sentence, and the full list of sources is at the bottom of the page. The about page describes how they are checked, and site updates lists what has changed.

Working numbers out? The tools add up square footage and cove base, count the cost of closed hours, and compare bids line by line.