Most resin floors are made to go down in a warm room. Sherwin-Williams' cold-temperature page says the majority of resinous flooring cures best at room temperature, and that most products are not recommended for cold installs and can cure improperly or not at all. This page collects what makers publish about freezers and coolers.
The minimums makers publish
| Source | Resin | Lowest installation temperature published |
|---|---|---|
| Stonhard, cold room article | Epoxy | 60°F |
| Sika, Sikafloor-264 data sheet | Epoxy | 50°F, air and slab |
| Stonhard, cold room article | Polyurethane | 40°F |
| Sherwin-Williams, Crylaflor system overview | MMA | 0°F |
| The Construction Specifier | MMA in general | -15°F |
| Sika, Sikafloor Pronto RB-1823 CQ system sheet | MMA | -20°F |
| Key Resin, MMA systems web page | MMA | -20°F |
| Flowcrete UK, Flowfast Accelerator sheet | MMA with a cold additive | -25°C (-13°F) |
Meeting the minimum is not the same as curing fast. At 50°F the Sika epoxy sheet gives about 24 hours before foot traffic, about 3 days before light traffic and about 10 days to full cure. Stonhard's article says that when a facility cannot raise the room temperature, an MMA system is necessary because it can be installed below 40°F.
Keep the room cold, or warm it up?
Sika's freezer system sheet says the freezer does not have to be turned off. It also says all foodstuffs must be removed during installation, and Sherwin-Williams' Crylaflor instructions say the same.
Warming a room so that epoxy can be used carries its own warnings. The Sika epoxy sheet says unvented heaters and certain heat sources may cause defects such as whitening or debonding. It also says not to apply the product while air and slab temperatures are rising.
Cooling the room back down matters too. Stonhard says freezer flooring projects often need phased installation and special curing procedures before the space returns to operating temperature.
What the crew does differently
They measure the floor. The Crylaflor instructions say the amount of curing agent depends on material and slab temperature, so the floor temperature must be measured before anything is mixed.
They add a cold additive. Sika's Sikafloor-101 AC Pronto is an additive for work below 32°F. In the freezer system it goes into the primer, the base coat and the top coat. Flowcrete's UK sheet for its Flowfast Accelerator raises the dose as the room gets colder: 0.5 percent of the resin weight between 0 and -5°C (32 to 23°F), up to 2.5 to 3 percent between -20 and -25°C (-4 to -13°F).
Both makers warn that the additive must never come into direct contact with the hardener, because the two can explode. Ask where the mix station will sit.
They manage material temperature. Flowcrete says to keep the materials in the cold work area for at least 24 hours first, so they are below 0°C (32°F) when mixed. Sika's general MMA primer sheet says to hold the material between 65 and 75°F for 24 hours before use. Ask where the pails will sit the day before.
They work fast and move air. The Sika freezer sheet gives 7 to 15 minutes of working time per mix, depending on temperature. It calls for explosion-safe ventilation and makes fans mandatory where air flow is restricted. The odor guide covers ventilation.
Condensation, doors and ice
A cold slab gets wet easily. A Building Design + Construction article by a senior project manager at Simpson Gumpertz & Heger gives the scale: with 70°F air on the warm side, condensation forms on a 40°F slab at about 33 percent relative humidity.
Data sheets answer with a dew point rule. Sika's general MMA primer sheet wants the slab and the uncured floor at least 5°F above the dew point. Flowcrete's sheets ask for 3°C (about 5°F) above it during application and hardening.
The door is where humid air gets in. A UK Health and Safety Executive case study describes a cold store door left ajar for long periods. Humid air entered, ice formed, and staff slipped on it. Ask how the doors will be handled while the floor is open.
The Sika primer sheet and the Crylaflor instructions both call for a dry surface. Neither says how frost or ice on a freezer slab gets removed. Ask.
Cure times in the cold
| Source | What it says |
|---|---|
| Sika, RB-1823 CQ freezer system | All components fully cure within one hour. Below freezing it may take longer. |
| Sherwin-Williams, Crylaflor instructions | Components typically cure in 45 to 60 minutes. The floor is fully functional one hour after the last coat. No separate cold figure is given. |
| Flowcrete UK, Flowfast Flexible Binder | About 30 minutes at 30°C (86°F) with 1 percent catalyst. About 60 minutes at 0°C (32°F) with 5 percent. |
| Flowcrete UK, Flowfast F1 Mortar Cold Grade, a repair mortar | For use at 0 to -25°C (32 to -13°F). Fully hardened within 3 hours. |
None of these is a promise for your room. Ask for the time at your temperature.
After the install: thermal shock and joints
Stonhard defines thermal shock as rapid temperature change that makes materials expand and contract at different rates. Its causes include hot-water washdowns on freezer floors, steam cleaning followed by immediate cooling, and dock doors opening all day. A floor that cannot take the movement can crack, blister or lose its bond.
Washdown is the severe one. Stonhard describes water as hot as 180°F on a floor as cold as 32°F, and says only urethane mortar systems withstand that. The Building Design + Construction article works through a 90-second wash with 150°F water. It raises the surface temperature 30°F, and the article says the shock can debond epoxy flooring. MMA has published heat limits too. Sherwin-Williams lists Crylaflor's heat resistance limit as 160°F intermittent and 140°F continuous. If you hot-wash a cold room, say so before a system is chosen. The cleaning guide has more.
Defrosting counts as well. A Flowcrete UK note on frozen food areas treats the gradual warming and cooling of a room during defrosting as thermal cycling.
Joints and cracks let water under the floor. Stonhard says water entering cracks or damaged joints freezes and expands, building pressure under the flooring. A Refrigerated & Frozen Foods article by a vice president of Painters USA warns that simply covering an expansion joint makes the floor fail from that point.
Small walk-in coolers can have a metal floor. Stonhard notes that metal moves with temperature and load, so the flooring must be formulated to bond to metal and needs a flexible bonding layer.
Under the slab: floor heat and frost heave
A freezer can freeze the ground beneath it. The Building Design + Construction article says ice under the slab can build up enough to cause structural failure, and that slab heating pipes or ventilated crawlspaces are typically needed to prevent frost heave in refrigerated buildings. It adds that slab cracks also damage floor finishes.
A Plant Services article lists the early signs: small cracks and bulges in the concrete, then an uneven floor. It says glycol systems normally heat the fluid to about 65°F. Its author works for Emerson and the article favors electric heating cable, so weigh the product advice. Tell the installer about any heaving, and whether the underfloor heat works.
What to tell the installer
- The room temperature on the day, and whether it can be raised.
- Defrost cycles and washdowns: how often, and how hot the water is.
- What is stored there, and when it can come out.
- Whether the floor is concrete or metal, and whether it is heated underneath.
- Any cracks, bulges, ice patches or failed joints.
What to ask the installer
- What is the published minimum temperature for each product in the system?
- Will the room stay cold or be warmed, and how is it brought back to temperature?
- What is the cure time at my room temperature, and when can forklifts go back in?
- How will frost, ice and condensation be handled, especially at the door?
- Where will materials be stored and mixed, and how will air be moved?
- How will each joint and crack be treated?
- What water temperature can the finished floor take?
Sources
- Sika, Sikafloor Pronto RB-1823 CQ system data sheet (2025)
- Sika, Sikafloor-101 AC Pronto cold temperature additive data sheet (2025)
- Sika, Sikafloor-13 Pronto MMA primer data sheet (2020)
- Sika, Sikafloor-264 epoxy data sheet (2026)
- Sherwin-Williams, Crylaflor system overview (2026)
- Sherwin-Williams, Crylaflor application instructions (2025)
- Sherwin-Williams, Cold Temperature Flooring Installation (web page, undated)
- Stonhard, 4 Things You Should Know Before Starting A Cold Room Project (2020, updated 2025)
- Stonhard, Flooring for Cold Storage and Freezer Facilities: Preventing Thermal Shock and Surface Failure (2026)
- Flowcrete UK, Flowfast Accelerator product sheet (2014)
- Flowcrete UK, Flowfast Flexible Binder product sheet (2014)
- Flowcrete UK, Flowfast F1 Mortar Cold Grade product sheet (2014)
- Flowcrete UK, Flooring for Frozen Food Areas (2018)
- Key Resin Company, Key MMA Systems (web page, undated)
- The Construction Specifier, Best practices for specifying resinous flooring systems (2021)
- Building Design + Construction, Building enclosure design guidelines for freezers and cold storage facilities (2010)
- Plant Services, How to prevent frost heave in cold storage spaces (2022)
- UK Health and Safety Executive, Ice build up in cold store costs time and money (case study, undated)
- Refrigerated & Frozen Foods, Flooring is Foundational for Cold Chain Profits (2020)
Keep reading
- Acrylic vs. MMA vs. epoxy: which resin fits a cold or busy building.
- Floor prep and moisture: what has to happen to the concrete first.
- Cleaning and maintenance: looking after the floor once it is in.
You reach the owner, the same person who looks at the floor, prices the job and runs the install. How this works.